SALLE DE PRESSE

SALLE DE PRESSE

20/10/2021

ICEACSA Group is committed to the user as the centre of green and safe mobility

Partager

ICEACSA Group actively participates in the 25th National Symposium of Roads and Works of the Local Administration (Vyodeal) held on 18 and 19 October in Pontevedra.   For two days, various representatives of the Public Administrations, companies linked to the road and institutions related to research in the road field, we have discussed the concept

15/09/2021

ICEACSA Group celebrates 10 years of stable presence in Latin America

Partager

Since its foundation in 1985, ICEACSA has positioned itself in the market as a pioneering and leading consultancy firm in the integral development of projects in the fields of engineering in general, transport infrastructures, mobility management, water and environment and territorial, urban and building development. In an environment that has taken on a global dimension,

06/09/2021

IN 2022 ICEACSA WILL BE CALLED ANTEA GROUP

Partager

The first quarter of 2022 will see the culmination of the integration process of ICEACSA Grupo into the Dutch engineering group Antea Group, a stage that began in November 2017 and which will be completed next year with the change of corporate names and the adoption of the Antea Group trademark across the board for

03/09/2021

ICEACSA Consultants in a joint venture with the Spanish Road Association will draft the Galician Road Safety Plan 2021-2025.

Partager

The Plan will form part of the current national and international road safety strategies in the application of Vision Zero principles.   The work to be carried out by the ICEACSA-AEC joint venture includes the drafting and subsequent monitoring of the Galician Road Safety Plan 2021-2025, with the mission of reducing the number of road

30/08/2021

ICEACSA Consultores has been awarded the contract for the “Study of the sewage infrastructures and drafting of the project to improve the sewage network and the wastewater treatment plant in O Barco de Valdeorras”.

Partager

The project aims to tackle the leaks of clean water that cause the sewage treatment plant to malfunction due to increased flow. In October 2015, work was completed on the extension of the O Barco de Valdeorras WWTP, designed for a population of 13,124 inhabitants. In this project, calculations were made of the flows entering